#EcoDigest: December 2022

Ukraine continues working to improve environmental protection mechanisms. We have reviewed developments in Ukrainian legislation during December and invite you to explore them with us.

The Verkhovna Rada adopted the revised EU integration bill No. 4187 on improving subsoil use legislation at its second reading. The initiative was developed by the Environment Ministry, the State Service of Geology and Subsoil and members of Parliament to modernise and deregulate the sector’s rules. It provides for simpler, faster permit procedures and removal of duplicate permits; digitisation and creation of a Unified State Subsoil Use Information System; the right to assess reserves using international standards; predictable operating conditions for subsoil users; protection of national interests by prohibiting citizens and residents of the aggressor country and sanctioned persons from using Ukrainian subsoil; measures against illegal extraction; and solutions to the problem of dormant licences.

Parliament placed on its agenda a bill amending legislation to overcome fuel dependence, reduce greenhouse gas emissions and develop electric vehicle charging infrastructure and electric vehicles. It also adopted a draft resolution on the Verkhovna Rada’s statement concerning the Russian Federation’s energy terrorism.

Ukraine’s Ministry of Environmental Protection and Natural Resources issued a procedural flow chart for issuing stationary-source air pollutant emission permits to certain businesses with Group 1 facilities and businesses whose facilities are located within the Exclusion Zone.

The Environment Ministry publishedthe first translated Best Available Techniques reference documents, BREFs, including documents on iron production, cement, lime and magnesium oxide production, and energy efficiency. Ukraine plans to implement these in line with Directive 2010/75/EU of the European Parliament and Council of 24 November 2010 on industrial emissions and integrated pollution prevention and control.

The Ministry also recommended that environmental and natural resources departments of regional administrations and the Kyiv and Sevastopol city administrations ensure open access to information for public participation in EIA and actively disseminate information about the procedure.

At the end of the year, the Ministry approved its plan for drafting regulatory acts in 2023. Planned work includes:

  • a bill amending Ukraine’s Code of Administrative Offences to strengthen liability for violations of legislation on pollutant release and transfer registration;
  • a bill amending Ukraine’s Tax Code concerning environmental taxes;
  • a draft Cabinet resolution amending the procedure for public hearings during EIA, approved by Resolution No. 989 of 13 December 2017;
  • a draft Cabinet resolution amending the procedure for submitting documentation for an EIA conclusion and financing EIA, and the procedure for maintaining the Unified EIA Register, approved by Resolution No. 1026 of 13 December 2017;
  • a draft Cabinet resolution amending the criteria for assessing business activity risks and determining the frequency of scheduled State Environmental Inspectorate oversight of environmental protection and the rational use, restoration and conservation of natural resources.

In December, the Cabinet adopted a resolution amending Annex 1 to Resolution No. 1010 of 13 December 2017. It simplifies construction of overhead power lines and substations, including by removing the requirement to conduct EIA.

The State Service of Geology and Subsoil held electronic auctions for special subsoil use permits. Three lots were sold: two initiated through the Subsoil User’s Investment Atlas and one nominated by the market. The three gas-bearing lots brought UAH 1.32 billion into the state budget. The permits are granted for 20 years for geological exploration of oil- and gas-bearing subsoil, including pilot development of deposits and subsequent oil and gas extraction.

Kyiv established a register of air pollutant emission permits. It was expected to be fully populated by June of the following year, with public access provided within three months after martial law ends.

We continue to follow the most important developments in environmental protection and will share them in future editions of #EcoDigest.